WHB Testing Center Completes First NDT Mission at Boiler Installation Site
Date:2026-10-13Views:
The successful conclusion of this project marks the first time that the WHB Testing Center has entered a power station boiler installation site to carry out non-destructive testing (NDT) of heating-surface installation welds.
PART.01 First On-Site Mission at a Boiler Installation
On October 10, the WHB Testing Center announced a new breakthrough: the team completed all on-site installation weld NDT tasks for the upgrade of the #9 boiler's rear platen superheater and high-temperature reheater tubes at Guodian Power Xuanwei Branch.
This was more than the conclusion of a project - it was the Testing Center's first entry into a power station boiler installation site to perform heating-surface weld inspection. The team completed every testing task to a high standard and safeguarded equipment weld quality with solid technical capability, laying a firm foundation for expanding the Center's boiler installation inspection business.
PART.02 A Challenging First Visit to the Site
Upon first entering the boiler installation site, the team faced numerous challenges. The project is located in Xuanwei, Yunnan, with a high-altitude climate, cross-trade construction, confined furnace space and dense scaffolding. The rear platen superheater and high-temperature reheater tube panels are closely arranged, and many small-diameter tube welds lie deep, are hard to reach and difficult to view, greatly increasing the difficulty of the inspection work.
In the past, the Testing Center's work mainly served the boiler manufacturing stage. This time, the team worked directly at the customer's unit retrofit site, dealing head-on with installation, construction, supervision and schedule pressures.
PART.03 RT + PA: Making Hidden Risks Traceable
For different heating-surface welds, the project adopted a combined RT and PA testing scheme. For the closely arranged rear platen superheater welds, conventional X-ray testing was applied to reliably ensure defect detection quality; for the high-temperature reheater tube panel welds, phased array ultrasonic testing (PA) was selected to suit the dense small-diameter tube conditions, greatly improving work efficiency and offering higher sensitivity to planar defects.
In addition, all welds followed a standardized workflow: grinding and cleaning, numbering and marking, data acquisition, film/image evaluation, and archiving of original records - making the whole testing process traceable and the results verifiable.
PART.04 Quality and Safety, Even in Confined Spaces
Before entering the site, a special work plan was prepared, together with combined safety and technical briefings. As the furnace is a confined work space, dedicated supervisors were assigned on site, protective equipment was fully provided, tooling use was standardized, and the risks of work at height and cross-trade construction were strictly controlled. The team scheduled RT and PA operations in off-peak periods, maintaining the inspection schedule while holding the safety bottom line.
PART.05 From Early September to October 10: From Workshop to Site
The project started in early September and was successfully completed on October 10. Despite altitude sickness, confined space and schedule pressure, all testing personnel successfully brought the in-plant testing capability to the customer's unit site. This means that the Testing Center's service radius has been extended from manufacturing quality control to quality assurance at power station maintenance and retrofit sites.
At the #9 boiler furnace work site, the WHB Testing Center successfully completed the installation weld inspection tasks, and the results passed the review of the Yunnan Special Equipment Inspection Institute on October 12 - a brand-new business breakthrough: the Center's business is no longer limited to in-plant product quality control, but now formally extends to quality assurance for in-service and retrofit power units.
Going forward, the team will continue, with quality first and safety always, to bring its in-plant NDT capabilities to more power station boilers, pressure vessels and retrofit and maintenance sites.
Wuhan Boiler Co., Ltd.